Place of Origin: | Qingdao, China |
Brand Name: | Compass |
Certification: | ISO 9001, SGS |
Model Number: | 815 |
Minimum Order Quantity: | 100pcs |
---|---|
Price: | Negotiable |
Packaging Details: | Plastic bag + carton + pallet |
Delivery Time: | 30-40days according to quantity |
Payment Terms: | L/C, T/T, Western Union, D/A, D/P |
Supply Ability: | 40tons per month |
Name: | AISI304 / AISI316 Handrail Stub Terminal | Material: | SS304(V2A) / SS316(V4A) /SS316L |
---|---|---|---|
Type: | Stub Terminal | Package: | Plastic Bag + Carton + Pallet |
Lead Time: | 35days | Application: | Holding Cables For Railings |
Highlight: | cable wire railing,cable railing systems |
Stainless Steel Cable Railing AISI304 / AISI316 Handrail Stub Terminal
Applications.
This series is widely used for cable railings for staircase, stairs, terrace, balcony accoring to needs.
Features.
1. Available wire rope diameter from 4mm to 20mm
2. Type : stub terminal
3. Material could be AISI304, AISI316, AISI316L.
4. Surface treatment is polished
5. Lead time: 35-45days according to needs.
6. Packing: Bag + Carton + Pallet
Compass is located in Qingdao city, China, who have manufactured and supplied stainless steel railings and fittings for more than 10 years, partners covers more than 30 countries.
Keeping long-term cooperation with every partner is our principle, so steady quality in products and service, no-time delivery and professional after sale service are the most important factors we stick to.
General terms.
- Lead time: 30-50days according to order quantities.
- Payment term: T/T 30% deposit, 70% balance payed according to the documents copy.
- Departure port: Qingdao or other ports according to needs.-
- Delivery term: FOB, CIF, DDU, DAP
Destination service.
DDU or DAP service could be supplied if needed. That means goods could be delivered to your address directly.
Why Compass?
Your inquiry will always be replied within 2 hours, our professional sales team will help you with every question.
Each product from Compass will pass 4 quality control steps before finished: raw material inspection, mid-production inspection, full inspection before packing and warehouse-out inspection. We believe quality articles is the best advertisement.
The satisfaction of our after-sale service is 99.5%. But we will keep working hard, to make everything from Compass better.
We're responsible for every piece(100%) from Compass. We will re-prepare and replace the items if there're unqualified ones affecting the selling or appliance because of our quality.
Material composition (%).
AISI304 | C (Max 0.08) ; Si (Max 1) ; Mn (Max 2) ; P (Max 0.045) S (Max 0.03) ; Cr (16 ~ 18) ; Ni (10-14 ) ; Mo (2 ~ 3) |
AISI316 | C (Max 0.08) ; Si (Max 1) ; Mn (Max 2) ; P (Max 0.045) S (Max 0.03) ; Cr (18 ~20) ; Ni (8~10.5 ) |
AISI316L | C (Max 0.03) ; Si (Max 1) ; Mn (Max 2) ; P (Max 0.045) S (Max 0.03) ; Cr (16~18) ; Ni (10~14 ) : Mo (2~3) |
Contact Person: Cora
Tel: 86-532-80913852
Fax: 86-532-55785060
Address: Room 1304, Building 18, No.9 Xiangtan Road, Chengyang District, Qingdao City, China.
Factory Address:Huanxiu Street, Jimo District, QIngdao City, China.